Arizona Department of Transportation
Multimodal Planning Division

MPD - Multimodal Planning Home Page
Safe Routes to School
Materials & Regional Support
Planning Assistance Program
Advisory Committee
Review\Selection Process
Eligible Activities
Ineligible Activities
Successful Projects
The 5 Es
How to Apply
Funded Projects
Evaluation
Training
Resources
FAQ
Contacts
State and Regional Planning
ADOT Home Page
    
Eligible Activities

Infrastructure projects - projects include the planning, design, and construction of infrastructure-related projects that will substantially improve the ability of students to walk and bicycle to school, including

  • sidewalk improvements,
  • traffic calming and speed reduction improvements,
  • pedestrian and bicycle crossing improvements,
  • on-street bicycle facilities,
  • off-street bicycle and pedestrian facilities,
  • secure bicycle and pedestrian facilities, and
  • traffic diversion improvements in the vicinity of schools. (Section 1404(f)(1)(A))

Given the general guidelines established in the legislation, each State DOT will be responsible for determining the specific types of infrastructure projects that are eligible for this program. Below is a list of potential infrastructure projects that some States have used for existing SRTS or related programs. This list is not intended to be comprehensive; other types of projects that are not on this list may also be eligible if they meet the objectives of reducing speeds and improving pedestrian and bicycle safety and access.

  • Sidewalk improvements; new sidewalks, sidewalk widening, sidewalk gap closures, sidewalk repairs, curbs, gutters, and curb ramps.
  • Traffic calming and speed reduction improvements: roundabouts, bulb-outs, speed humps, raised crossings, raised intersections, median refuges, narrowed traffic lanes, lane reductions, full- or half-street closures, automated speed enforcement, and variable speed limits.
  • Pedestrian and bicycle crossing improvements: crossings, median refuges, raised crossings, raised intersections, traffic control devices (including new or upgraded traffic signals, pavement markings, traffic stripes, in-roadway crossing lights, flashing beacons, bicycle-sensitive signal actuation devices, pedestrian countdown signals, vehicle speed feedback signs, and pedestrian activated signal upgrades), and sight distance improvements.
  • On-street bicycle facilities: new or upgraded bicycle lanes, widened outside lanes or roadway shoulders, geometric improvements, turning lanes, channelization and roadway realignment, traffic signs, and pavement markings.
  • Off-street bicycle and pedestrian facilities: exclusive multi-use bicycle and pedestrian trails and pathways that are separated from a roadway.
  • Secure bicycle parking facilities: bicycle parking racks, bicycle lockers, designated areas with safety lighting, and covered bicycle shelters.
  • Traffic diversion improvements: separation of pedestrians and bicycles from vehicular traffic adjacent to school facilities, and traffic diversion away from school zones or designated routes to a school.

Planning, design, and engineering expenses, including consultant services, associated with developing eligible infrastructure projects are also eligible to receive infrastructure funds.

    
 
©Copyright 2005 Arizona Department of Transportation